Release Notes
2.0.0 (11/16/2011)
- Agency reports
- Schedule moved to P1L
- Group and subgroup designations
1.7.0 (6/28/2011)
1.6.1 (3/29/2011)
- Group and subgroup assignment
1.6.0 (2/24/2011)
- Redesign of the SB 2030 calculator
- Branded SB 2030 launch button
- New project field 'Group', editable in the project summary tab
- project manager much faster on load
- Project manager allows filtering by project group
- Export to Excel capabilities from the project manager
1.5.0 (1/21/2011)
- SB 2030 special variances allowed, using special variance application form. Functions similar to partial variance, requiring renewal at each phase
- New role 'SB 2030 Approver' created. Defaulted globally to Garrett Mosiman
- SB 2030 Approver functions as gatekeeper between guideline leader and agency contact approval at SD phase and beyond
- Partial variances expire and require renewal upon each new phase
- Correction to S4D, S4E, S4F compliance rules. Now allows N/A for compliance
- Guidelines that are pursued (but not required) better indicated in the project dashboard
v1.4.0 (12/3/2010)
- SB 2030 Calculator and integration into MSBG E1C
- SB 2030 specific project types
v1.2.0 (7/12/2010)
- Updated project metrics scorecard
- Max upload size increased 40 MB
v1.1.0 (5/24/2010)
- Notes at the project level. Editable by administrators, viewable by users.
- Global compliance check re-run after a change to any guideline. User is warned if their change affects other already approved guidelines
- Entry of guidelines allowed that aren’t necessarily applicable at the given phase. Guidelines will still show in gray, but allow entry
- Entries are automatically copied forward to future phases after each entry. This helps users work ahead without being encumbered by re-entering data
- All answers shown in phase report, even if not applicable at the given phase
1.0.0 (12/28/2009)
|
|